Solution Partner Automation SIEMENS
Your reliable partner on the field of a modern industrial automation, robot applications and regulated drives
Automotive industry - overview |
||||
![]() |
||||
| Automobiltechnik Praha s.r.o., Prague Czech republic |
2002 | Welding workplace - Case Assembly LHD/RHD | Control system S7-314, OP7, robot KUKA KR125/3 | KUKA, Simatic, DeviceNet, OP |
| Automotive Lighting s.r.o. Jihlava Czech republic |
2011 | Assembly workplace for headlamps, Project HONDA Civic - pushing the glass into the body, application of the gluing mass |
Control system BOSCH CML20.1, panel BOSCH VCP05, 1x robot KUKA KR30/30 | KUKA, BOSCH, Profibus, Bosch |
| 2010 | Assembly workplace for headlamps, Project W204Mopf - pushing the glass into the body, application of the gluing mass |
Control system 2x BOSCH CML20.1, 2x panel BOSCH VCP05, 1x robot KUKA KR30/30 | KUKA, BOSCH, Profibus, Bosch | |
| 2009 | Assembly line for headlamps - pushing the glass into the body, project MEGANE BD95 |
Control system BOSCH CL-ZE201N, 2x panel SÜTRON BT5N, 1x robot KUKA KR30/30, 1x robot KUKA KRC KR5 arc | KUKA, BOSCH, Profibus, Devicenet, SÜTRON | |
| 2008 | Assembly line for headlamps - pushing the glass into the body, project MEGANE BD95 | Control system BOSCH CL-ZE201N, 2x panel SÜTRON BT5N, 1x robot KUKA KR30/30 | KUKA, BOSCH, Profibus, Devicenet, SÜTRON | |
| 2008 | Assembly line for headlamps - pushing the glass into the body, project Megane BD95 |
Control system BOSCH CL-ZE201N, 2x panel SÜTRON BT5N, 1x robot KUKA KR30/30 | KUKA, BOSCH, Profibus, Devicenet, SÜTRON | |
| Autopal s.r.o. Hluk Czech republic |
2005 | Production line for front lights - spare parts, the coating of soldering paste | Robot 1xKUKA KR6 | KUKA, Simatic, DeviceNet, OP |
| BATZ CZECH s.r.o., Frýdlant nad Ostravici Czech republic |
2011 | Robotic welding cell CMT - workplace 2 | Control system 1x ET200S-IM151/8PN/DP, 1x panel TP177B, 1x robot KUKA KR5 arc | KUKA, Simatic, Profinet Safety, IO-Link, TP |
| 2010 | Robotic welding cell CMT - workplace 1 | Control system 1x ET200S-IM151/8PN/DP, 1x panel TP177B, 1x robot KUKA KR5 arc | KUKA, Simatic, Profinet Safety, IO-Link, TP | |
| BRISK Tábor, Czech republic |
2008 | Robotic workplace for injecting press ARBURG | Control system S7-313C-2DP, robot KUKA KRC2sr | KUKA, Simatic, Lumberg, Profibus, DeviceNet, Ethernet, OP177B |
| FORD Köln Germany |
1996 | Production line of engines FORD | Control system S5 115U, 2x OP20 | Simatic, Indramat, OP |
| Grupo Antolini Czech republic |
2004 | Production line of auto ceilings, the coating of soldering paste | Robot programming 2x KUKA KR125/2 | KUKA, DeviceNet |
| KOITO CZECH s.r.o., Czech republic |
2010 | Workplace "Plasma Application" | Control system MITSUBISHI FX2 overprogramming, panel EasyView MT8070iH, 1x robot MOTOMAN | MITSUBISHI, MOTOMAN, TP, RS 485 |
| Magna Cartech a.s. Ceske Velenice Czech Republic |
2007 | Welding workplace - Renfort Charniere L/P, project PSA A7, the cell No. 2 | Control system 1x S7-315, 1x TP170, Robot programming 2x KUKA KR140 | Simovert, KUKA, Simatic, Profibus, Interbus, OP |
| 2007 | Welding workplace MIG/MAG, project PSA/ŠKODA | Control system S7-315DP, 1x OP77, Robot programming 5x KUKA KR16/2 | KUKA, Simatic, Profibus, Interbus, OP | |
| 2007 | Welding workplace MIG/MAG - Raidisseur Doublure Porte G/D, project PSA | Control system S7-315, 1xTP170, Robot programming 1xKUKA KR6 | Simovert, KUKA, Simatic, Profibus, Interbus, Touch Panel | |
| 2006 | Welding workplace - Renfot Charniere PSA | Control system 1x S7-315, 1x TP170, robot programming 2x KUKA KR140 | KUKA, Simatic, Profibus, Interbus, OP | |
| 2006 | Welding workplace - auto ceiling stiffener PSA A7 | Control system S7-315DP, 1xOP77, robot programming 5x KUKA KR16/2 | KUKA, Simatic, Interbus, OP | |
| Rieter CZ a.s. Chocen Czech republic |
2004 | Reconstruction of cut cabin for water stream cutting | Robot 1xKUKA KR16 + KL250 | KUKA, DeviceNet |
| Škoda - Auto, a.s. plant Mlada Boleslav Czech republic |
2008 | Welding line, přílateral wall, project SK25x - Production intensification | Robot programming 6x KUKA VKR150/2 | KUKA, Simatic, Interbus, Ethernet, SWAC,Touch Panel |
| 2006 | Welding line of the front dome Škoda - Roomster |
Control system S7-416, 1xpanel SWAC, 3x panel PC760, robot programming 2x KUKA VKR150 and 6x KUKA VKR200 | KUKA, Simatic, Interbus, Ethernet, SWAC,Touch Panel | |
| 2005 | 3x manual welding jig for the floor Škoda Roomster |
Control system Phoenix Contact UNI | Phoenix>, Interbus, Touch Panel | |
| 2005 | Seaming workplace | Control system Phoenix Contact ILC 200 UNI, robot programming KUKA VKR125 |
KUKA, Phoenix, Interbus, Touch Panel | |
| 2005 | Seaming machine for front dome Škoda Roomster |
Control system Phoenix Contact ILC200 UNI | Phoenix, Interbus, Touch Panel | |
| 2005 | Pre-assembly line of an engine and of a chassis erection fit Škoda - Octavia II |
Control system 2x S7-315, 4x OP17, frequency changers SEW Movidrive, Movimot | SEW, Simatic, Profibus, OP | |
| 2005 | Welding line for side parts Škoda A5- Octavia II |
Robot programming 44 x KUKA VKR200 | KUKA | |
| 2005 | Welding press machine Škoda - Roomster |
Control system Phoenix Contact ILC200 UNI | , Interbus, Touch Panel | |
| 2004 | Welding line for a car body Škoda A5- Octavia II |
Control system 8xS7-416, 3x S7-318DP, 20x panel SWAC, 2x panel PC760, robot programming 39x KUKA VKR200 | KUKA, Simatic, Interbus, SWAC | |
| 2001 | One-purpose machine – the cutter for side mirrors Škoda B5-Superb |
Control system S7-315, positioning FM 387 | Simatic | |
| 2001 | Seaming machine for roof window Škoda A04 - Fabia |
Control system S5-95 | Simatic | |
| 2000 | One-purpose machine – press machine for flywheel | Control system S7-314 | Simatic | |
| 2000 | Welding line for back cap Škoda - Fabia limousine |
Control system S5-115 CPU945, 2 x panel SWAC, robot programming 1x KUKA VKR125/2 | KUKA, Simatic, Interbus, SWAC | |
| 1999 | Conveyor of front domes Škoda A04 - Fabia |
Control system S5-95U | Simatic | |
| 1999 | Welding line of front dome Škoda A04 - Fabia |
Control system S5-115 CPU945, 3xpanel SWAC, robot programming 7xKUKA VKR125/2 | KUKA, Simatic, Interbus, SWAC | |
| 1999 | Welding lines for side parts Škoda - Fabia limousine |
Control system S7-315 | Simatic, Interbus | |
| 1999 | Welding lines for front and back doors Škoda A04 - Fabia |
Robot programming 22x KUKA VKR125/2 | KUKA, Interbus | |
| Škoda - Auto, a.s. plant Kvasiny Czech republic |
2008 | Welding line, C-column, project SK461 (Superb II) | Control system 1x S7-416-2, 1x panel SWAC, 1x Panel PC677, Robot programming 4x KUKA VKR210 | KUKA, Simatic, Interbus, Ethernet, SWAC, Touch Panel |
| 2008 | Welding line, car body, project SK461 (Superb II) | Control system 3xS7-416-2, 3x panel SWAC, 4x panel PC677, Robot programming 1x KUKA VKR210, 6x KUKA VKR360, 5x KUKA VKR500 | KUKA, Simatic, Interbus, Ethernet, SWAC, Touch Panel | |
| 2008 | Welding line, side parts, project SK461 (Superb II) | Control system 2xS7-416-2, 3x panel SWAC, 3x Panel PC677, Robot programming 1xKUKA VKR6, 6x KUKA VKR210, 5x KUKA VKR360 | KUKA, Simatic, Interbus, Ethernet, SWAC, Touch Panel | |
| 2001 | 2x Welding line for doors L/R Škoda B5 - Superb |
Control system 2x S7-318DP, 2xpanel SWAC, Robot programming 2x KUKA VKR150/2 | KUKA, Simatic, Interbus, SWAC | |
| 2001 | Production line for a welded car body Škoda B5 - Superb |
Control system 2x S7-318DP, 12xpanel SWAC, Robot programming 7x KUKA VKR200/2 | KUKA, Simatic, Interbus, SWAC | |
| 2001 | Welding line for side parts Škoda - Fabia limousine |
Control system S7-315 | Simatic | |
| Škoda - Auto, a.s. plant Vrchlabí Czech Republic |
2000 | Welding line for car body Škoda A4 - Octavia 4x4 limousine | Control system S7-314 | Simatic |
| 1999 | Welding line for car body Škoda A4 - Octavia 4x4 Combi | Control system S7-314 | Simatic | |
| TI Automotive AC s.r.o. Jablonec nad Nisou Czech Republic |
2008 | Production line of tubes for aircondition - project AUDI I, II | Control system 1x S7-315DP, 2x OP77, Robot programming 2x robot Fanuc ARC Mate 120iBe | Fanuc, Simatic, Profibus, OP |
| 2007 | Production line of tubes for aircondition -workplace 5 | Control system1x S7-315DP, 2x OP77, Robot programming 1x robot Fanuc ARC Mate 120iBe | KUKA, Simatic, Profibus, Interbus, OP | |
| 2006 | Production line of tubes for aircondition - workplace 4 | 1x OP77, Robot programming 1x robot Fanuc ARC Mate 100iBe | Simovert, KUKA, Simatic, Profibus, Interbus, OP | |
| 2005 | Production line of tubes for aircondition - workplace 1, 2, 3, project OPEL | Control system 1x S7-315DP, 3xOP77, Robot programming 3x robot Fanuc ARC Mate 100iBe | Fanuc, Simatic, Profibus, OP | |
| VISTEON - Autopal s.r.o., Nový Jičín |
2010 | The grinding of headlamp overflows | Control system 1x S7-315DP, 2x OP77, 2x robot FANUC ARC Mate 120iBe | FANUC, Simatic S7-315, Profibus, OP |
| 2010 | Assembly workplace for headlamps, pushing the glass into the body, application of the gluing mass |
Overprogramming control system S7-414-2DP, 1x OP170B, Micromaster 6440, robots KUKA 1x KR15/2, 1x KR30/3, 1x KR60/3> | KUKA, SIEMENS Micromaster, Simatic S7-400, Profibus, OP | |
| 2009 | Assembly workplace for headlamps, pushing the glass into the body, application of the gluing mass |
Overprogramming control system S7-414-2DP, OP170B, robot KUKA KR60-3 | KUKA KR60-3, Simatic, Profibus, OP | |
| 2008 | Handling workplace for bending machines of tubes | Robot 2x KUKA KR16 Floor | KUKA, DeviceNet | |
| 2005 | Line for headlamps - spare parts, application of the gluing mass | Robot 1x KUKA KR6 | KUKA | |
| 2003 | Line for headlamps, application of the gluing mass | Robot 1x KUKA KR30 | KUKA, Profibus | |
| 2002 | Line for headlamps, application of the gluing mass | Robot 1x KUKA KR15/2 | KUKA, Profibus | |
| VISTEON - Autopal s.r.o., Rychvald |
2010 | Assenbly workplace for headlamps - pushing the glass into the body | Control system S7-315-2DP, 1x OP177B, robots KUKA 1x KR6-2, 1x KR30/3, 1x KR60/3 | KUKA, Simatic S7-315 Profibus, OP |
| WAGON Automotive Bela pod Bezdezem Czech republic |
2008 | Welding workplace- Renfor Charniere L/R, project PSA A58 | Reconstruction of welding workplace - frame of the 5th doors | |
| 2007 | Welding workplace Central Cross Member | Control system S7-314, OP77, Robot programming 2xKUKA KR200 | KUKA, Simatic, Profibus, Interbus, OP | |
| 2006 | Front fender, Project PSA A7, cell 2 | Control system S7-315-2DP, OP77, Robot programming 2x KUKA KR6, fequency changers 2xSIMOVERT MC | Simovert, KUKA, Simatic, Profibus, Interbus, OP | |
| 2005 | Welding workplace – subsets of frames of L/R doors, Škoda Roomster | Control system S7-314, OP77, Robot programming 1x KUKA KR140 | KUKA, Simatic, Profibus, Interbus, OP | |
| 2005 | Welding workplace – front fender PSA A7, cell 1 |
Control system S7-315-2DP, OP77, Robot programming 2x KUKA KR6, frequency changers SIMOVERT MC | Simovert, KUKA, Simatic, Profibus, Interbus, OP | |
| 2005 | Welding workplace – frame of the 5th doors Škoda Roomster |
Control system 2x KUKA KR6, frequency changer SIMOVERT MC | Simovert, KUKA, Simatic, Profibus, Interbus, OP | |
| 2004 | Welding workplace, Node part L/R Škoda A5-Octavia II |
Control system S7-314, OP7, robot 2x KUKA KR125 | KUKA, Simatic, DeviceNet, OP | |



